Projects

Mobley Contractors specializes in construction in many different areas, including dams, bridge, roadways, water and waste water treatment, pile driving / cofferdams, street car rail systems and hydroelectric plants. Mobley is committed to completing high quality projects on schedule that meets the requirements of the plans and specifications in a safe manner, on time, and within budget.

Norfork DamMobley Contractors was the prime contractor for the construction of the 65 ton maintenance bulkhead and the 42" diameter steel pipe siphon.  The siphon is used to maintain a minimum stream flow in the Norfork River. 

Clinton BridgeMobley Contractors was the prime contractor for the conversion of the Rock Island railroad bridge crossing the Arkansas River into a pedestrian walkway; renamed the Clinton Presidential Park Bridge.

Murray Dam BridgeMobley Contractors was the prime contractor for the construction of the southwest approach to the Big Dam Bridge. The Society of American Travel writers named it onr of the top 10 bridges to visit in the United States.

Eufaula Hydro DamMobley Contractors was the prime contractor for the rehabilitation of three each, 22 feet diameter penstocks inside Eufaula Dam, and rehab to the existing bridge deck over the dam.   

Sound Barrier WallMobley Contractors was the prime contractor for the construction of 3,154.81 feet of noise barrier wall along the north side of I-40 of the Macarthur Drive exit in North Little Rock.

River Rail ProjectMobley Contractors was the prime contractor for the construction of trackwork and overhead contact system in the downtowns of Little Rock and North Little Rock, Arkansas. 

Older ProjectsMobley Contractors has served as prime and sub contractor on a variety of projects over the last 40 years.

 

Contact Us

952 Highway 287
P.O. Box 150
Morrilton, AR 72110

(501) 354-2510