kanopolis-3d-header
sound_barrier_wall_II
bayou-meto-header
lake-kanopolis-header
norfork_bulkhead_III
clinton_presidential_bridge_III
1/6 
start stop bwd fwd
 
 

University of Memphis Pedestrian Bridge

University of Memphis Pedestrian Bridge

Contract Amount: $1,891,230.39

In this project, Mobley is subcontracted to construct the two vertical concrete towers for the cable stay bridge. This includes maintenance of traffic, vertical concrete work, installation of elastomeric bearings. The other half of the contract is a pedestrian land bridge over railroad and street. Traffic on Walker Street is to remain open at all times.

Contact Us

952 Highway 287
P.O. Box 150
Morrilton, AR 72110

(501) 354-2510