Older Projects

Pinnacle Hill Parkway/Horsebarn Road Bridge Project - AHTD

This $4.9 Million project involved widening Pinnacle Hills Parkway/Horsebarn Road from 2 to 5 lanes for over 1/2 mile and the construction of a bridge in Rogers, Arkansas.

 
River Rail Street Car Project Phase II - Central Arkansas Transit Authority
2005-2007
Mobley completed the $5.78 Million Construction project of the River Rail Streetcar Extension Project-Phase II in Little Rock, Arkansas. The .9 mile extension of track links the William Jefferson Clinton Presidential Library and Heifer International to the existing track in Little Rock and North Little Rock.
 
White River Hydroelectric Power Project - Batesville, AR
2004-2007
The project consisted of the complex construction and start up of three turbine hydroelectric power generating plants on the White River. The power plants were built and installed within existing lock and dams on the river that were constructed in the early 1900s.
 
I-430 and Shackleford Bridge Extension Project
This schedule driven project consisted of extending additional lanes on an existing bridge and interstate ramps crossing a double three lane interstate (I-430) in Little Rock, Arkansas. The project was successfully completed to meet the developers schedule and accommodate for the opening of the 97 acre West Little Rock's Shackleford
Crossing Mall.
 
Central Arkansas Transit Authority(CATA)
$12 Million-Construction of an electric street car system. The project consisted of installing an Overhead Contact System (OCS) and rail in the downtowns of Little Rock and North Little Rock, Arkansas. The River Rail project is bringing back the historic street car trolley connecting major city attractions.
 
Arkansas State Highway and Transportation Department. (AHTD)
AHTD-Culberhouse St-Hwy 49 ( Jonesboro , Arkansas)
$6.1 Million- Widening of 2.7 miles of Hwy 63B in Jonesboro , Arkansas . The project consist of base and surface courses, drainage, realignment of RR Crossing, traffic signal equipment, and erosion control.
 
AHTD-Cossatot River and Relief STRS.
$5.2 Million-Construction of a composite W-Beam Spans Bridge and composite plate girder spans bridge on Hwy 71 crossing the Cossatot River East of DeQueen, Arkansas .
 
AHTD-Hwy 67-East STRS. And APPRS
$3.9 Million-Replacing (4) existing bridge structures and approaches on 1.1 miles of Hwy 226, NW of Tuckerman, Arkansas .
 
AHTD-Hwy 63-Culberhouse St. ( Jonesboro , Arkansas) $8.7 Million-Widening of 3.5 miles of Hwy 63B in Jonesboro , Arkansas . The project consists of base and surface courses, (2) W Beam Bridges, (1) Precast Box culvert.
 
AHTD-Alcoa Rd Interchange (Benton, Arkansas)
$5.0 Million-Upgrade Alcoa Interchange with improved ramp alignments and the construction of a new continuous steel plate girder bridge over I-30 west of Benton, Arkansas .
 
AHTD-Davis Tr.-Willow ST . (Searcy, Arkansas)
$2.4 Million-Widening 1.1 miles fo Hwy 67 B in Searcy , AR. The project consists of grading, base/surface courses, triple box culverts, traffic signal equipment, and erosion control.
 
AHTD-Maple St.-Hwy 112 S. ( Fayetteville, Arkansas)$1.8 Million-Widen of Hwy 112 in Fayetteville, Ar. The project consists of grading, drainage, base/surface courses, traffic signal equipment, and erosion control.
 
AHTD-Illionois Bayou STR. And APPRS. (NW of Dover, Arkansas)
$2.6 Million-Construction of W- Beam Spans Bridges over the Illinois Bayou NW of Dover, Arkansas.
 
AHTD-Lamar-Pope Co. Line (W of Russellville, Arkansas)
$7.1 Million-Construction of (3) Bridges over Piney Creek, Lamar, and Hwy 359 on I-40 west of Russellville , Arkansas .
 
AHTD-Sevier St.-West of Alcoa Rd (Benton, Arkansas)
$3.8 Million-Construction of (2) Steel Plate Girder Bridges over I-30 West of Benton, Arkansas.
 

2000

Chemical Demilitarization Support Facility - US Army Corps of Engineer
$3.4 million demolition project at the Pine Bluff Arsenal located in Pine Bluff , Arkansas . The project consisted of demolition of pumps, gas lines, water lines, water tanks, and miscellaneous buildings.
 

1995

Curtis Revetment, Red River Waterway, Bosier Parish, Louisanna
US Army Corps of Engineers
$5.1 million construction of over 4,800 LF of stonefill revetment, 4,100 LF of pile revetment and dike, and 2550 LF of stonefill dikes.
 

1994

Gurley Pit Superfund Site, Edmondson , Arkansas
US Army Corps of Engineers
$6.5 million EPA Superfund site cleanup near Edmondson , Arkansas . The project involved: the remediation of sludge containing oils, metals, and PCBs; the construction of a RCRA landfill; Solidification and placement of 20,000 cubic yards of material with the containment cell; On-site water treatment of surface water; and off-site incineration of recovered oils.

Mobley Contractors, Inc. received the U.S. Army Corps of Engineers, Southwestern Division Construction Contractor of the year Award for the Civil Works Program.
 

1990

Water Treatment Plant Expansion, Benton , Arkansas
City of Benton , Arkansas
$4.1 million construction of a clarifier treating unit, chemical filter building, pumping stations, waste water basin, carbon feeder building and the installation of raw water meter associated with the existing water treatment plant.

 