Fairview-Mississippi River Bridge - AHTD
- Details
- Category: Uncategorised
- Published on Friday, 12 July 2013 17:39
- Written by Philip
- Hits: 5868
AHTD Job No. R20069 Fairview-Mississippi River Bridge
The purpose of this project is to widen 4.4 miles of Hwy 82 in Chicot County to four or five lane roadway. Mobley under Subcontract to Ideal Construction Company is constructing the 360 feet Continuous Composite Prestressed Concrete Girder Unit Bridge (Total Span Lengths 72', 72', 72', 72', 72'). The project includes the removal of the existing bridge structure.
Star City - AHTD
- Details
- Category: Uncategorised
- Published on Friday, 12 July 2013 17:39
- Written by Philip
- Hits: 6408
AHTD Job No. 020356 Hwy.212 - Hwys 11/425 Connector
The purpose of this project is to construct embankments at the southern end of the project and pave 7.7 miles of State Highway 530 and construct Highways 11/425 connector in Lincoln County. Mobley under Subcontract to Graves and Associates, Inc. is constructing the 235.26 feet Continuous Composite Girder Overpass Bridge including 1740 LF of 18" Square Concrete Piling, 7031 SF of Retaining Wall at the abutments, etc.
Conway - AHTD
- Details
- Category: Uncategorised
- Published on Friday, 12 July 2013 17:39
- Written by Philip
- Hits: 6398
AHTD Job No. 080395 Conway South Interchange-Hwy. 365 (Grading & Strs)
The purpose of this project is to construct the embankment and overpass bridge structures for the I-40 / Hwy 365 Interchange at Conway in Faulkner County. This project consists of Earthwork, Aggregate Base Course, ACHM Binder and Surface Courses, Minor Drainage Structures, Three Plate Girder Overpass Bridge Structures (Total Span 767.59'), One Triple R. C. Box Culvert (Total Span 30.79'), Guardrail, Erosion Control Items, Retaining Walls, Maintenance of Traffic and Misc. Items.
Ferndale Creek
- Details
- Category: Uncategorised
- Published on Friday, 12 July 2013 17:39
- Written by Philip
- Hits: 5973
Ferndale Creek Bridge and Approaches
Pulaski County, Arkansas
The project consist of constructing approximately 75 linear feet of 34 foot wide bridge and approximately 1000 linear feet of roadway construction including striping, signage, and asphalt surfaces. The project includes the installation of a detour, the removal of the existing bridge structure, the construction of new bridge and roadway, then the removal of the detour.
Clinton - AHTD
- Details
- Category: Uncategorised
- Published on Friday, 12 July 2013 17:39
- Written by Philip
- Hits: 6487
AHTD Job No. 080390 Hwy. 16 East - Hwy. 65B South (Clinton)
The purpose of this project is to widen 1.431 miles of Hwy. 65 from three lanes to five lanes in Clinton in Van Buren County. This project consists of Earthwork, Aggregate Base Course, ACHM Base, Binder and Surface Courses, Two Continous W-Beam Unit Bridges (Total Span Lengths 134.26' and 376.30'), Signal Items, a Storm Drainage System, Concrete Curb and Gutter, Sidewalks, Wire Fence, Erosion Control Items, Retaining Walls, Maintenance of Traffic and Misc. Items.