Delta Heritage Trail Phase V - ARDPT
- Details
- Category: Projects
- Published on Friday, 10 May 2019 19:13
- Written by Austin
- Hits: 2708
Delta Heritage Trail Phase V - ARDPT
Contract Amount: $2,754,684.36
Mobley is working as a subcontractor for Crow Construction on the Delta Heritage Trail project. The scope of work performed by Mobley includes Demolition of bridges 1,2,3,4,5, & 6; Furnish and installation of bridges 1,2,3,4,5, & 6; Provision of work roads for access to bridge locations; All work pertaining to and within the station limits of bridges 1,2,3,4,5, & 6; Provision of any required permits/documents for work pertaining to the bridges.
University of Memphis Pedestrian Bridge
- Details
- Category: Projects
- Published on Friday, 10 May 2019 17:56
- Written by Austin
- Hits: 2891
University of Memphis Pedestrian Bridge
Contract Amount: $1,891,230.39
In this project, Mobley is subcontracted to construct the two vertical concrete towers for the cable stay bridge. This includes maintenance of traffic, vertical concrete work, installation of elastomeric bearings. The other half of the contract is a pedestrian land bridge over railroad and street. Traffic on Walker Street is to remain open at all times.
Bayou Meto Basin
- Details
- Category: Projects
- Published on Thursday, 09 May 2019 19:16
- Written by Austin
- Hits: 2203
USACE Bayou Meto Basin
Contract Amount: $15,374,853.95
The Bayou Meta Basin project consisted of the construction of approximately 2,700 linear feet of Canal 1000 with associated drainage ditches and the construction of a cast in place reinforced concrete inverted siphon, measuring approximately 550 linear feet in length, to convey Canal 1000 under an existing bayou. Also included in the work was clearing and disposal of debris therefrom; temporary diversion of the existing bayou during construction of the siphon and the restoration of diversion area afterwards; installation of storm drainage pipes, concrete headwalls, and a flap gate; furnishing and placing of filter stone and riprap, turfing and environmental protection.
Bull Shoals Draft Tube Rehabilitation
- Details
- Category: Projects
- Published on Thursday, 09 May 2019 19:23
- Written by Austin
- Hits: 2959
Bull Shoals Draft Tube Rehabilitation
Contract Amount: $939,175.00
Bull Shoals Draft Tube Rehabilitation involved the rehabilitation of the two unit draft tube gates A & B. This included repairing/replacing Gate A, Gate A stem and stem guides, Gate A actuator, Gate B rehabilitation, Gate B stem and stem guides, Gate B actuator and miscellaneous steel items. Electrical feeders were replaced to supply power to the gate operators. The rehabilitation of the gates will require the installation/construction of a bulkhead in the spillway to dewater the draft tubes.
Previous Projects
- Details
- Category: Projects
- Published on Friday, 15 June 2012 19:34
- Written by Super User
- Hits: 12381
Clinton Presidential Library Bridge - City of Little Rock
Pinnacle Hill Parkway/Horsebarn Road Bridge Project - AHTD
This $4.9 Million project involved widening Pinnacle Hills Parkway/Horsebarn Road from 2 to 5 lanes for over 1/2 mile and the construction of a bridge in Rogers, Arkansas.
2000
1995
1994
1990