Bull Shoals Draft Tube Rehabilitation

Bull Shoals Draft Tube Rehabilitation

Contract Amount: $939,175.00 

Bull Shoals Draft Tube Rehabilitation involved the rehabilitation of the two unit draft tube gates A & B. This included repairing/replacing Gate A, Gate A stem and stem guides, Gate A actuator, Gate B rehabilitation, Gate B stem and stem guides, Gate B actuator and miscellaneous steel items. Electrical feeders were replaced to supply power to the gate operators. The rehabilitation of the gates will require the installation/construction of a bulkhead in the spillway to dewater the draft tubes.

 

 

Contact Us

952 Highway 287
P.O. Box 150
Morrilton, AR 72110

(501) 354-2510