Bayou Meto Basin

USACE Bayou Meto Basin

Contract Amount: $15,374,853.95

The Bayou Meta Basin project consisted of the construction of approximately 2,700 linear feet of Canal 1000 with associated drainage ditches and the construction of a cast in place reinforced concrete inverted siphon, measuring approximately 550 linear feet in length, to convey Canal 1000 under an existing bayou. Also included in the work was clearing and disposal of debris therefrom; temporary diversion of the existing bayou during construction of the siphon and the restoration of diversion area afterwards; installation of storm drainage pipes, concrete headwalls, and a flap gate; furnishing and placing of filter stone and riprap, turfing and environmental protection.

                          

 